Completion of house renovation Another view after completion of the renovation with the winter garden in the background (new parquet on Stolte floorboards) Another view, also looking towards the kitchen Kitchen view on the right, winter garden on the left View from the winter garden towards the interior View of the kitchen. The suspended ceiling contains the drainage pipes for the walk-in shower and the toilet of the shower room. Staircase with a view looking down First floor featuring sanded floorboards and painted railings Bedroom on the first floor First-floor shower room with an ultra-flat, near-flush shower tray Master bathroom, renovated and restored Rooms prior to the start of works Rooms prior to the start of works (Terrace) Winter garden with 40 cm thick exterior wall, which was later demolished and bridged with steel beams Demolition of the masonry, bridged with HE beams according to structural specifications. Side note: The steel beams in the basement, which support the masonry shown on the left and right, had to be replaced first—this was an unforeseen task. Staircase and shower room prior to the start of works First-floor bedroom prior to the start of works Former kitchen, now demolished, renovated, and replaced with a new fitted kitchen